From Nothing to Something
Have you ever seen a home that has a random drain in the basement which is intended for a bathroom? Sometimes the drain is left in the middle of the unfinished basement, in this homes case it was left inside a framed yet unfinished closet of a finished basement. Our goal; turn it into a beautiful and spacious full bathroom!
We started by completely demoing the "closet" space, elevating part of the floor in the garage, framing for the new bathroom size and layout, excavating into the concrete to position the drains and running plumbing & electrical to create an actual functioning bathroom. As always we enjoyed helping the homeowner pick out the tile and fixtures. See below for some highlights;
-
Full bathroom with large shower
-
Vertical tile work with matching accent niche
-
Chrome trim and fixtures
-
Energy saving push button toilet
-
Budget friendly elements
Project took 3 weeks start to finish
Location: Montgomery Village, MD
" Working with Infinity was a great experience from start to finish. During the first design meeting I mentioned what I like and what I wanted this blank space to be and they exceeded my expectations! I never imagined an empty closet with the main drain in the middle of it could become this beautiful space! We are very happy and have since moved down to the basement to use as our new master.
We will definitely use them again for other projects"
Sandra G. / Montgomery Village, MD / Bathroom Creation
Finished bathroom
Vertical tile installation, Chrome trim and matching accent niche
Vertical tile installation, Chrome trim and matching accent niche