top of page

Rockville Bathroom Remodel 

As if our clients can't get enough of us! We got to do a remodel to the upstairs bathroom of the previously posted "Basement Bathroom Remodel" 

Yay!! It was so much fun working with this family they are troopers, (they will understand why I say that!) but with all honesty, for newbies into the remodeling world they really pulled the design part of the upstairs bath together quickly & 

with almost none of my help! 

 

Our favorite parts of this bathroom are listed below;

  • Geometric tile, installed in this way gave this bathroom 3D look & life!

  • Vertical double niche with tile shelf, matches bathroom floor tile design 

  • New Bathtub and New window (we moved it up a little)

  • Brushed Nickel trim and fixtures

  • Gray tones, whites tones and even some blue tones 

  • Dark grout to pull everything together and really make things pop

  • Recessed medicine cabinet 

  • Vanity w/bottom elegant storage & top with perfect amount of gray veining

  • Water saving toilet 

Check out all the before, during and after photos! 

Project took 3 weeks start to finish 

Location: Rockville, MD 

IMG_4772.JPG
bottom of page